Factory &
Manufacturing
Lumivmed manufactures hair growth, 308nm UV phototherapy, RF & facial aesthetic, and LED & red light therapy devices. Our own factory supports OEM/ODM production and wholesale orders for distributors, clinics and private-label brands.
Production Coordination
Your Equipment.
Our Manufacturing Team.
Work directly with our factory team on the model, configuration, quantity and destination market. We review the sample and production requirements before scheduling the batch.
Production Range
Sample Preparation First
Review the sample’s appearance, functions and configuration before batch production. Preparation is typically 3–5 days, depending on the model and customization scope. New product development requires a separate schedule.
Bulk Order Coordination
Confirm quantity, components and customization requirements before agreeing the production schedule. The final timing is reviewed for your order.
Factory-Direct Manufacturing
Lumivmed operates its own factory in Dongguan. Discuss manufacturing requirements directly with the team handling your sample and batch order.
Own Factory
Sample preparation & batch production
Manufacturing Process
From Components to Packaged Equipment
Our manufacturing workflow covers material preparation, assembly, power-on checks and packing. The production configuration is set for the model being manufactured.
Incoming Materials
Check components against the model requirements before production.
SMT & PCB Assembly
Prepare and assemble the mainboard for the product configuration.
Laser Diode Installation
Precision ESD‑protected assembly in cleanroom environments. Every laser diode is accurately mounted & soldered,devices.
Semi-Finished Functional Testing
Inspected to ensure steady, reliable laser output for our therapy, Check core functions before completing the machine build.
Complete Machine Assembly
Build the complete equipment to the production specification.
Aging & Power-On Testing
Run power-on and aging checks on assembled equipment.
Finished-Product & Appearance Check
Review the finished device’s functions, settings, finish and labeling.
Packaging & Shipment
Check accessories, manuals and packaging before the order is dispatched.
Inside Our Factory
Production Areas Behind Your Equipment.
See assembly, power-on checks, inspection and packing as parts of the manufacturing workflow.
Production Line
Production and component assembly.
Complete Machine Assembly
The complete device build and configuration.
Aging & Power-On Area
Powered equipment during the production checks.
QC & Equipment Checks
Equipment checks during manufacturing.
Pre-Shipment Inspection
Finished equipment before packing and dispatch.
Material & Finished-Goods Storage
Materials and finished products in storage.
Incoming Materials
Components received and prepared for production.
Packing & Dispatch
Labeled and packed, ready for shipment.
Detailed inspection criteria, third-party inspection arrangements and model-specific documentation are covered on our dedicated Quality & Compliance page.
Quality & ComplianceProduction Schedule
Lead Time & Delivery
Indicative lead times are provided below. The final production schedule is confirmed after reviewing all order-specific factors with the customer.
Indicative Lead Times
From production start to ready-for-shipment
Model and customization scope apply
Small to mid-size batch
Standard volume order
Large volume order
Note: Timing is confirmed for the model and order. Production lead times exclude international transit; new product development requires a separate schedule.
Factors That Affect Lead Time
Model configuration, customization scope, quantity, component availability and documentation requirements affect production timing. Review these points with our team before the batch is scheduled.
Product Model & Specifications
Different product models have different assembly complexity and testing requirements. Product specifications must be finalized before production can begin.
Customization Requirements
Private-label branding, custom colors, software localization, and packaging design require additional confirmation and preparation time before production.
Order Quantity
Larger order quantities require longer production and inspection cycles. Quantity is one of the primary inputs used to build the confirmed production schedule.
Component Availability
Availability of key components and materials at the time of order affects the production start date. Lumivmed reviews component stock as part of the order-confirmation process.
Documentation & Compliance Approval
Orders requiring specific compliance documentation, regulatory certificates, or third-party testing may have additional preparation time factored into the schedule.
Ready to Plan Your
Production Order?
Send the model, estimated quantity, destination market and customization requirements. Our manufacturing team will review the configuration and production timing for your order.